4/1/2023 0 Comments Bn.com 3 minutes to midnight![]() Information about our construction approach at Hatfield Peverel We are continuing to carry out ground investigations and other survey works to progress a more detailed design for this scheme. Prior to the Planning Inspectorate starting the full examination period, members of the public are now able to register to participate in the examination and provide a response to our application during the Relevant Representation period, which commenced on 22 September 2022. The next steps in the process are shown in the diagram below: The Section 56 Notice notifies the public that the A12 Chelmsford to A120 Widening Scheme Development Consent Order application has been accepted for examination. It has subsequently been accepted on 12 September 2022, allowing us to progress through to examination. We are pleased to announce that our Development Consent Order Application was submitted to the Planning Inspectorate on 15 August 2022. Planning Inspectorate Acceptance of Scheme Submission Southbound lane 1 closed between junction 22 and 21.Northbound junction 22 exit slip closed.Northbound junction 21 entry slip closed.Northbound lane 2 closed between junction 19 and 21.Northbound junction 19 exit slip closed.Northbound lane 1 closed between junction 18 and 19.Northbound lane 1 closed between junction 20B and 20A.Northbound lane 1 closed between junction 23 and 25.Northbound junction 21 exit slip closed.Northbound junction 20B entry slip closed.Northbound junction 20A exit slip closed.Northbound junction 19 entry slip closed.Northbound lane 2 closed between junction 18 and 19.Northbound lane 1 and 2 closed between junction 19 and 20B.Tuesday 7 to Friday 10 March (9pm to 6am) Southbound junction 24 exit slip road closed.Southbound lane 1 closed between junction 25 and 23.Wednesday 1 to Friday 3 March (9pm to 6am) Northbound lane 1 closed between junction 21 and 22 from 9pm to 6am.2-way traffic signals on Braxted Road Rivenhall End from 9:30am to 3:30pm.Northbound lane 1 closed between junction 21 and 22.Southbound lane 1 closed between junction 21 and 20A.To do this work, we'll need to have some traffic lights and road closures on the A12. (Note: Night time working is 21:00 to 06:00, and daytime working is 09:30 to 15:30) Road closures Friday 24 February (9pm to 6am) ![]() And we'll be making boreholes along where the new road will be built to get geotechnical information on the type of soil and rocks, and to locate the groundwater levels. ![]() We'll also be looking at the drainage, as well as surveying the condition and make up of the existing tarmac on the A12. ![]() We'll be making sure that we know where all the utility pipes and cables are. We are doing surveys and ground investigations to provide technical information, ahead of the next phase of more detailed scheme design. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |